Mobile Dock Projects

Documented mobile dock builds and configuration history.

Featured archive project

Pitt Ohio Mobile Dock Project

Archive plans dated December 2022 identify a 53-foot Mobile Docking Solutions trailer configured for Pitt Ohio with eight roll-up door positions and eight dock levelers.

Four transfer positions were arranged on each side of the trailer. Separate overlapping door tracks preserved usable interior height while the reinforced conversion supported the openings and individual leveler interfaces.

The retained build record follows the conversion from structural preparation through framed openings, exterior fabrication, leveler installation, interior work and transport closures. Completed passenger- and driver-side views document the two four-position door banks.

  • 53-foot trailer platform
  • Eight roll-up door positions, four per side
  • Eight dock levelers
  • Proprietary overlapping track arrangement
  • Reinforced walls, floor and door framing
  • Exterior stability jacks and transport-ready closures
Completed Pitt Ohio eight-door mobile dock trailer
53′Trailer length
8Door positions
8Dock levelers
4 + 4Positions by side

From trailer to working platform

Build Progress

The fabrication sequence documents the structural opening work, door framing, interior conversion, dock-leveler installation and transport closures, not only the finished exterior.

Completed Project Views

Additional Build Archive

The MDS archive includes multi-door receiving platforms, refrigerated configurations, finished interiors, integrated office and restroom spaces, power systems and site-specific access arrangements.

View Complete Build Media